
On Sept. 12, our community gathered to celebrate the grand opening of the new Fieldgate Sports Complex, Whitby’s most significant recreation investment to date.
You may already know that this facility features Durham’s largest pool, a twin-pad arena, multi-purpose gymnasium, lit pickleball, tennis and basketball courts, Whitby’s first multi-purpose artificial turf field, a playground, skatepark, pump track, and more.
What you might not know, is that it was built with sustainability in mind.
The complex is designed and certified to both LEED Gold and Zero Carbon Building standards through the Canada Green Building Council.
It’s the first facility in Canada to combine a twin-pad arena, double gymnasium, and large aquatic center while achieving both certifications.
In addition, the Fieldgate Sports Complex is the first facility in Whitby built to achieve Tier 3 of the Whitby Green Standard, demonstrating how the Town is leading by example and applying its highest sustainability standards to its own infrastructure.
To achieve net-zero operational carbon, the design eliminates fossil fuel use for heating, uses renewable energy, and reduces high global warming potential refrigerants.
To support its net-zero carbon operations, the facility incorporates geothermal heating and cooling, heat recovery, and on-site renewable electricity generation. The geothermal system includes 58 wells extending approximately 183 metres (600 feet) underground, while heat generated by the arena refrigeration system is captured and reused for water heating, spectator heating and other building needs.
On the roof, 688 solar panels generate clean electricity on site, helping reduce the facility's demand on the electrical grid.
Sustainability extends beyond the building itself. More than 1,400 trees have been planted across the site, and the development includes 20 electric vehicle charging stations, restored natural habitat, reduced light pollution and stormwater features that help manage rainfall while supporting local biodiversity.
The facility also includes emergency backup power to maintain critical building operations during outages, increasing resilience during severe weather and other disruptions.
We are very appreciative that the Government of Canada supported this project with $25 million in funding through the Green and Inclusive Community Buildings program, in recognition of the facility’s sustainability features.
Learn more at https://www.whitby.ca/sportscomplex